Flood management in mahanadi basin using HEC-RAS and gumbel's extreme value distribution

By: Parhi, Prabeer Kumar.
Publisher: Kolkata Springer 2019Edition: Vol. 99(4), December.Description: 750-755p.Subject(s): Civil EngineeringOnline resources: Click here In: Journal of the institution of engineers (India) Series ASummary: Using Gumbel’s extreme value distribution and HEC-RAS hydrodynamic model, the levels of peak floods at different locations of Mahanadi River reach between Hirakud dam and Naraj (delta head of Mahanadi) for 10, 25, 50 and 100 years return period are estimated. Based on the simulation study carried out considering 36 cross sections for 310 km length of river, it is observed that the heightening of embankment system for almost all the existing bank stations both in the left and right embankments are required. In the present study, the analysis has been carried out considering 25 years return period floods (45067 cumecs), as this flood is considered as most significant and under changed climatic conditions. The results of the study show that out 36 cross sections, at 23 sections, heightening of embankment spanning from a minimum of 0.11 m to a maximum of 10.63 m in the left bank should be carried out. Similarly for right bank embankment heightening is needed from 0.09 m to a maximum of 9.94 m. This can very effectively minimize the flood hazard of the Mahanadi River system.
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode Item holds
Articles Abstract Database Articles Abstract Database School of Engineering & Technology
Archieval Section
Not for loan 2018218
Total holds: 0

Using Gumbel’s extreme value distribution and HEC-RAS hydrodynamic model, the levels of peak floods at different locations of Mahanadi River reach between Hirakud dam and Naraj (delta head of Mahanadi) for 10, 25, 50 and 100 years return period are estimated. Based on the simulation study carried out considering 36 cross sections for 310 km length of river, it is observed that the heightening of embankment system for almost all the existing bank stations both in the left and right embankments are required. In the present study, the analysis has been carried out considering 25 years return period floods (45067 cumecs), as this flood is considered as most significant and under changed climatic conditions. The results of the study show that out 36 cross sections, at 23 sections, heightening of embankment spanning from a minimum of 0.11 m to a maximum of 10.63 m in the left bank should be carried out. Similarly for right bank embankment heightening is needed from 0.09 m to a maximum of 9.94 m. This can very effectively minimize the flood hazard of the Mahanadi River system.

There are no comments for this item.

Log in to your account to post a comment.
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha